Project Details
Location Portland, OR
Project Size 5,000 Wall
Cubic Yards 442
Contractor Moore Excavation Inc
Architect N/A
Engineer Consor

Public Works

Palensky Wildlife Tunnel

ODOT & Columbia River Estuary Study Taskforce commissioned the installation of a 54" diameter underpass pipe below highway 30 near Burlington, OR. Over 600 LF of concrete battered channelizing walls were built to funnel wildlife into the underpass in order to cross the road and access the Palensky Wildlife Area. Various species including some endangered can now use the underpass and avoid traffic on the busy highway above.

Footings, Channelizing Walls, Wall Flares, & Tunnel Slab

Let's Collaborate

Explore More Projects